SLS replaced the conventional 400W Polaris 120W High Bay projectors in the 5 x 5 Arena Arena in Maroussi. Apart from the impressive lighting result and the 75% reduction in consumption, the problem of disturbance in apartment buildings with light pollution of conventional headlights was also solved. Now all the light goes only into the stadium, having multiple benefits.